These pages show live Public Performance Measure (PPM) statistics.

Trains are classed as 'on-time' if less than 5 minutes late at their final destination (less than 10 minutes if long distance).

Updated: 07:56

Key: On-time (<5/10 min late) Late (>5/10 min & <30 min) V. late (>30 min) or cancelled


Govia Thameslink Railway

91%
9%
0%
PPM
91
Trains
70
On-time (<5/10 min late)
64
Late (>5/10 min & <30 min)
6
V. late (>30 min) or cancelled
0

Govia Thameslink Railway routes

TL Bedford Mainline
  62% (5 of 8)
38%
TL Kent Inner
  79% (53 of 67)
7%
14%
SN Mainline
  83% (15 of 18)
17%
TL South London
  91% (125 of 136)
7%
2%
GN Inners
  100% (10 of 10)
GN Outers
  100% (11 of 11)
Gatwick Express
  100% (5 of 5)
SN Coastway (Non-London)
  100% (7 of 7)
SN South London Metro
  100% (7 of 7)
SN West London Line
  100% (1 of 1)
TL Brighton Mainline
  100% (3 of 3)

Return to National PPM