These pages show live Public Performance Measure (PPM) statistics.

Trains are classed as 'on-time' if less than 5 minutes late at their final destination (less than 10 minutes if long distance).

Updated: 09:42

Key: On-time (<5/10 min late) Late (>5/10 min & <30 min) V. late (>30 min) or cancelled


Govia Thameslink Railway

84%
10%
6%
PPM
84
Trains
221
On-time (<5/10 min late)
186
Late (>5/10 min & <30 min)
20
V. late (>30 min) or cancelled
15

Govia Thameslink Railway routes

GN Outers
  54% (6 of 11)
19%
27%
GN Inners
  58% (10 of 17)
7%
35%
TL Kent Outer
  66% (4 of 6)
18%
16%
TL Bedford Mainline
  71% (5 of 7)
15%
14%
TL Brighton Mainline
  80% (12 of 15)
20%
SN Mainline
  82% (37 of 45)
14%
4%
SN South London Metro
  84% (44 of 52)
13%
3%
TL North Metro (MML)
  89% (34 of 38)
9%
2%
Gatwick Express
  100% (12 of 12)
SN Coastway (Non-London)
  100% (43 of 43)
SN West London Line
  100% (5 of 5)
TL South London
  100% (5 of 5)
TL Kent Inner
  100% (3 of 3)

Return to National PPM