← Greater Thameslink Railway Historical
Greater Thameslink Railway
Thameslink North Outer (MML)
Average on time
78.5%
Over this period
Data points
76
Days tracked
Data
Date
Breakdown
On time
Late
V. late
2026-10-14
58.1%
13.4%
28.5%
2026-09-23
61.8%
15.9%
22.4%
2026-09-14
44.3%
11.4%
44.3%
2026-09-12
77.9%
10.4%
11.7%
2026-09-09
60.8%
12.9%
26.3%
2026-08-21
78.3%
11.2%
10.6%
2026-08-16
31.7%
15.1%
53.2%
2026-08-15
41.3%
25.2%
33.5%
2026-08-14
26.7%
40.4%
32.9%
2026-08-10
63.6%
11.1%
25.3%